Site work takes a day. The acceptance report shouldn't take three weeks.
Turn every site visit into a report your customer can sign.
Text, site photos, test results, drawings, spreadsheets and PDFs go in once. A structured, validated acceptance report comes out — ready to sign and invoice.
SIGNALTOWERREPORTSIGNEDPAID
01 · SITE
Every site ends in a document.
Macro towers, rooftops and indoor systems in malls and offices. Every installation has to be proven — with photos, checklists and measurements — before it is accepted.
02 · EVIDENCE
Captured once, in the right place.
Text, photos, test results, drawings, spreadsheets, PDFs — collected in one place, filed where the report needs them. Nothing is retyped into a spreadsheet later.
PHOTOS · CHECKLISTS · MEASUREMENTS · DRAWINGS · TABLES
03 · VALIDATE
Checked before it ships.
Before a report is built, AutoGenReport shows exactly what is still missing — down to a single photo slot — so the first submission is the complete one.
EVIDENCE // COMPLETE
VALIDATION // PASSED
REPORT // READY
04 · DOCUMENT
Site to report.
Structured · Validated · Ready to deliver
Cover, contents, sign-off pages, photo pages and tables are laid out automatically in your customer's own report format. Hundreds — even thousands — of pages, laid out for you.
05 · DELIVER
Signed faster.
Get paid faster.
Acceptance, then invoice, then payment. Every round of corrections pushes all three back; a complete first submission pulls them forward.
The cash for your next site comes from your own work — not from a loan.
- ROUNDS OF CORRECTIONS
- COMPLETE ON FIRST SUBMISSION
DAYS, NOT WEEKS
06 · Contact
Let's get your next report signed.
Tell us about your sites and the report formats your customers expect. We'll set AutoGenReport up around them — so your team spends its time on site, not on paperwork, and your invoices go out while the work is still fresh.
For engineers · project managers · project directors · owners
Built for telecom. Ready for any engineering acceptance report.